Pages

Friday, May 11, 2018

Working in the Garden

This week we are finally getting into the 80's-90's for highs and the flowers we planted are wilting. Thankfully today with the help of our children the sprinkler system is back in action. However we are still missing the timer and the 4 way splitter ... I'm sure they are somewhere are here.

Friday, May 4, 2018

2018! Finally

So thank you for allowing me 2 years to update this blog.

I'm finally up to the current year.

Let's see what happened at the beginning of this year:.

Continued progress with the master bathroom.

January 2018 Phillip kept plugging away at electrical and drywall.  Below is a picture of the light switch and the green (moisture resistant) drywall next to the shower/tub area. 
Trust and believe we tried to find a better spot, but as you walk in the bathroom the door opens to the left, so we didn't think putting the lightswitch behind the door was logical.  On the right is the sole heating vent for the bedroom and bathroom, so running electrical thru that wasn't an option either.  So it's directly on the wall across from the door.

The bathroom is still waiting on mud/tape and painting, but all the elements of a functional bathroom are there.  Lights work, plumbing works, floors are safe and it's insulated and warm.  After all that we've been thru with this house... it's all I necessarily need right now anyways.