Pages

Sunday, April 3, 2011

Day 10 of home ownership

Yesterday, April 2 2011, Day 10, my father in law helped me remove the plaster from the walls of the main bathroom. Only thing left to do is:
>Remove the toilet
>Install plug for toilet drain
>Remove Bathtub
>Remove flooring
>Install new plumbing throughout house
>Upgrade electrical system in bathroom (move bathroom from fuse box to circuit breaker)
>Install new subfloor
>Install new backer board around lower half of wall
>Install Medicine cabinet
>Install moisture resistant sheetrock around upper half of room
>Paint sheetrock
>Install bathtub
>Install tile
>Install toilet
>Install bathroom sink
>Install bathroom door
I know it seems like a lot but it actually is not

No comments:

Post a Comment